Skip to content
Jaya One Driveway Milling for Waterproofing Installation (+1,800m²)Aiman2025-08-13T02:18:38+00:00
Surface Removal and Preparation for Plaza 33’s Driveway (>2,000m²)Aiman2025-05-12T08:18:54+00:00
Residence Floor Milling for Refurbishment (410 m²)Aiman2025-03-19T07:06:07+00:00
Kota Kemuning Warehouse Floor Milling for Renovation (1,100 m²)Aiman2025-03-04T13:44:37+00:00
Metrojaya Mid Valley Megamall (16,000 m²)Aiman2025-02-09T23:50:28+00:00
Subsea Engineering Factory Concrete Floor Rectification and Surface PreparationAiman2025-01-17T06:26:26+00:00
Ikano Power Centreadmin2021-07-27T07:06:44+00:00
Amerin Shopping Mall Reinstatementadmin2021-07-06T02:48:41+00:00
F1 Sepang Racing Circuit
( 8000 m2 )admin2021-07-06T02:48:35+00:00
Betamex Factory, Rawang (6,000 m2)admin2021-07-06T02:32:39+00:00