Project Description

48KM of Rail Track Surface Preparation

Project Objective

The client wanted an appropriate and cost effective bonding texture for the subsequent grout topping to install the 48 KM of rail tracks.

How We Help

SGI has prescribed a Key Slot Texture using Reverse Cut Milling Machines that resulted in optimum bonding and huge cost savings on the grout material of more than RM 1.5 million.

SGI’s methodological approach meets the DOSH requirements in terms of environmental impact, sound and dust pollution.