Project Description

Genting Highland Carpark (25,000 m2)

Project Objective

Client wanted to remove and shave off 25 mm of existing concrete substrate where it will be topped off with concrete of the same amount on top of the PU epoxy floor coating system.

How We Help

We deployed 3 Parana P4500 milling machine where we are able to work 30 × faster than their existing approach. We milled down the surface to exactly 25mm deep consistently, where we have to ensure the final original levels are maintained.