Project Description
Service: Refurbishment & Reinstatement Works
Ikano Power Centre
Project Objective
This is a major refurbishment job to overhaul the shopping center. Because the mall is operating partially throughout the project, no hacking can be done. Our method produces no vibration and lesser sound.
How We Help
For this job, we removed 600mm thick slabs for the installation of travellator, removing concrete ramp, demolishing concrete walls, staircase, etc. We deployed our diamond wall cutting, slab cutting, and wire sawing machine to complete the job.