Project Description
Service: Concrete Parana Milling
Smart Tunnel (93,000 m2)
Project Objective
The objective was to establish a suitable texture profile for the bonding and topping of a 50mm wear retardant surface. The incorrect low-end equipment and methodological approach by the main contractor has resulted in failure of pull test and subsequent topping failure.
How We Help
By using our machine, we managed to shave off 6mm – 8 mm of existing substrate, exposing existing granite aggregate with the correct and suitable profile. Our productive and well-established method has result in huge costs savings where we have quicker turnaround time, overheads, lesser structural defects and rectification works to be done.